Cabin Foundations

Cabin Foundation Prep

  • ​Site leveling and foundation preparation is the customers responsibility.
  • Cabins can be placed straight on the ground, stone pad, cement slab, concrete footers, block foundation, or full basement. All foundations need to be no higher then 18″ above grade.
  • Block foundations and full basements need to have cross supports every 8 feet.
  • We can provide the plans for the foundation at purchase.
  • We need at least two feet on either side of the cabin and 16 feet of overhead clearance  along your drive and property to deliver your cabin.
  • If you are having your cabin set on a  block foundation or basement we need at least 100 feet of room on one end of the foundation so we can backup to the foundation to slide the cabin off onto the foundation.